轉動皮帶傳送開關,使其處于“開”位置,觀察皮帶是否有跑偏現(xiàn)象,并調(diào)整漲緊螺栓,使其校正。
Turn the belt conveyor switch to the "on" position, observe if the belt is running off, and adjust the tension bolt to make it correct.
開機前,依據(jù)間隔框寬度,松開打膠頭緊定螺栓,調(diào)整兩擠膠頭的間隔距離,調(diào)整時,要使框的對稱中心、兩個小壓輪寬度的對稱中心、兩打膠頭的對稱中心重合(此項只有在間隔框寬度改變時進行調(diào)整),調(diào)整完畢緊固螺釘。
Before starting the machine, loosen the fixing bolts of the glue head according to the width of the spacing box, adjust the spacing distance between the two glue heads. When adjusting, make sure that the symmetrical center of the box, the symmetrical center of the width of the two small pressure wheels, and the symmetrical center of the two glue heads coincide (this item can only be adjusted when the width of the spacing box changes). After adjusting, tighten the screws.

工作前溫度調(diào)節(jié): 因各廠家生產(chǎn)丁基膠規(guī)定的加熱溫度及工藝參數(shù)不同,所以設定打膠座溫度一般為120-140度,膠缸溫度為110-120度(此值僅作參考),待加熱溫度達到設定值15-30分鐘后,方可打膠。
Temperature adjustment before work: Due to the different heating temperatures and process parameters specified by various manufacturers for producing butyl rubber, the temperature of the glue holder is generally set at 120-140 degrees, and the temperature of the glue cylinder is set at 110-120 degrees (this value is only for reference). The glue can only be applied after the heating temperature reaches the set value of 15-30 minutes.
This article is dedicated by the insulated glass butyl adhesive coating machine. For more relevant knowledge, please click on: http://m.qqmuchang.cn Sincere attitude. We will provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Stay tuned